TCS - The Drying Experts logo
Home / Products / Clean Room Accessories / Shoe Rack
This page shows indicative specifications. Final configuration and a detailed datasheet are confirmed with TCS engineering before order.
Clean Room Accessories / GA-603

Shoe Rack

SS clean-room shoe rack supporting controlled footwear changeover.

Configured to Process RequirementSS304 / SS316 ConstructionxGMP-Aware Build
TCSTCSTCSTCSTCSTCSTCSTCSTCSTCS
IMAGE PLACEHOLDERShoe Rack — product photo to be supplied

The SS Shoe Rack organises footwear storage at the gowning boundary, supporting a controlled changeover sequence alongside the Cross Over Bench. Open-shelf or pigeon-hole configurations are available.

TCSTCSTCSTCSTCSTCSTCSTCSTCSTCS
DIAGRAM PLACEHOLDERCross-section / working-principle diagram to be supplied
  1. 01Exact working sequence is confirmed against the customer's process datasheet at order stage.

Typical Applications

Footwear storage at gowning boundary

Industries Served

APIFormulationsFood Processing

Where Shoe Rack sits in a typical process line

Uncontrolled AreaShoe Rack / Cross Over BenchClean Room
01

SS304 / SS316 Construction

Material of construction selected per product sensitivity and customer specification.

02

Configured to Process Requirement

Capacity, drive and instrumentation sized against the confirmed process datasheet.

Built In-House

Designed, fabricated and tested at the Jeedimetla facility, not outsourced.

Direct After-Sales Support

Spares and service supplied directly by the original manufacturer.

ModelNo. of CompartmentsDimensions (mm)MOCFinish
TCS-SR-20201200×400×900SS304Matte
Indicative figures only — final GA drawing and datasheet issued at order confirmation. Subject to process requirement.
  • Contact PartsSS304 or SS316 as specified, finished to a cleanable standard.
  • Drive / UtilitySized to the confirmed capacity and duty cycle.
PLC-based controls with data loggingDQ / IQ / OQ documentation packageExplosion-proof electricals (where applicable)

Designed with cGMP and xGMP principles in mind

Construction practices are intended to align with commonly accepted xGMP expectations for pharmaceutical process equipment — crevice-free welding, cleanable surfaces and appropriate contact-part finishing. TCS does not issue regulatory certification; compliance of installed equipment within a specific facility is subject to the customer's own validation and regulatory process. Subject to process requirement.

Open-shelf or pigeon-hole — which is better?

Pigeon-hole compartments keep pairs separated and organised; open shelving is faster to clean. We confirm based on the customer's SOP.

Can it be paired directly with a Cross Over Bench?

Yes, the two are commonly specified together for a complete gowning-entry layout.

Is it freestanding?

Yes, standard units are freestanding; wall-mounted versions are available on request.

PDF

Product Brochure

PLACEHOLDER — brochure file to be attached

GA

GA Drawing

PLACEHOLDER — general arrangement drawing to be attached

DS

Technical Datasheet

PLACEHOLDER — datasheet to be attached

Get a sizing recommendation for your batch.

Share your material, target capacity and process requirement — a TCS engineer will respond directly.

Request a Quote