Shoe Rack
SS clean-room shoe rack supporting controlled footwear changeover.
The SS Shoe Rack organises footwear storage at the gowning boundary, supporting a controlled changeover sequence alongside the Cross Over Bench. Open-shelf or pigeon-hole configurations are available.
- 01Exact working sequence is confirmed against the customer's process datasheet at order stage.
Typical Applications
Industries Served
Where Shoe Rack sits in a typical process line
SS304 / SS316 Construction
Material of construction selected per product sensitivity and customer specification.
Configured to Process Requirement
Capacity, drive and instrumentation sized against the confirmed process datasheet.
Built In-House
Designed, fabricated and tested at the Jeedimetla facility, not outsourced.
Direct After-Sales Support
Spares and service supplied directly by the original manufacturer.
| Model | No. of Compartments | Dimensions (mm) | MOC | Finish |
|---|---|---|---|---|
| TCS-SR-20 | 20 | 1200×400×900 | SS304 | Matte |
- Contact PartsSS304 or SS316 as specified, finished to a cleanable standard.
- Drive / UtilitySized to the confirmed capacity and duty cycle.
Designed with cGMP and xGMP principles in mind
Construction practices are intended to align with commonly accepted xGMP expectations for pharmaceutical process equipment — crevice-free welding, cleanable surfaces and appropriate contact-part finishing. TCS does not issue regulatory certification; compliance of installed equipment within a specific facility is subject to the customer's own validation and regulatory process. Subject to process requirement.
Open-shelf or pigeon-hole — which is better?
Pigeon-hole compartments keep pairs separated and organised; open shelving is faster to clean. We confirm based on the customer's SOP.
Can it be paired directly with a Cross Over Bench?
Yes, the two are commonly specified together for a complete gowning-entry layout.
Is it freestanding?
Yes, standard units are freestanding; wall-mounted versions are available on request.
Product Brochure
PLACEHOLDER — brochure file to be attached
GA Drawing
PLACEHOLDER — general arrangement drawing to be attached
Technical Datasheet
PLACEHOLDER — datasheet to be attached
Get a sizing recommendation for your batch.
Share your material, target capacity and process requirement — a TCS engineer will respond directly.